Mantanzas High School Baseball Field Pole Installation
Project Planning
Comprehensive and meticulous, ensuring seamless execution of netting solutions.
Design & Engineering Expertise
Innovative and experienced, delivering custom and efficient designs.
Unparalleled Work Ethic
Dedicated and committed, providing reliable and high-quality service.
Overview
Gorilla Netting was hired to auger, set, and pour concrete for four (4) steel poles at a depth of 11′ and a height above ground of 46′ and 49′, respectively.
For more information on pole installations, contact a Gorilla Netting representative today.
Client: Mancanza High School
Location: Palm Coast, Florida
Services: Steel Pole Drilling & Setting
Challenge
When it comes to drilling and setting steel poles, there is much more involved than one could expect. Installing steel poles on a high school baseball field might face challenges such as ensuring compliance with safety regulations to prevent accidents. Additionally, the logistics of transporting and maneuvering heavy steel poles onto the field without damaging the field or surrounding areas could pose logistical challenges.
Solution
To ensure a successful installation, a high school can contract a licensed contractor like Gorilla Netting, experienced in such projects. Gorilla Netting will utilize specialized equipment for precision augering, setting, and pouring concrete for the steel poles. With our expertise, the poles can be securely anchored at the specified depth and raised to the required heights above ground level, meeting safety standards and providing reliable support. This professional approach minimizes risks, guarantees quality workmanship, and ensures timely completion of the installation process.