Gorilla Netting completed Phase 2 of a multi-phase driving range netting project at the prestigious Ocean Reef Club, encompassing both netting replacement on existing sections and new installations in the back corners and along the range perimeter.
Client: Ocean Reef Club
Location: Key Largo, FL
Services: Driving Range Netting
Challenge
Ocean Reef Club's aging driving range netting required partial replacement across multiple panel spans, along with new netting installation to expand and complete enclosure coverage in previously unprotected areas including the back right and back left corners.
Solution
Gorilla Netting replaced netting panels spanning approximately 47' to 51' in the back left corner, and 46' to 50' in the back right corner, in addition to the front replacement panels ranging from approximately 44' to 50'. New installations added six panels at approximately 50' each. An access entryway with a 10' opening and 10' high net was incorporated, along with additional netting running into the driving range from the opening. Detailed measurements were taken across all spans prior to fabrication to ensure precise, custom-fitted panels. Scope included demolition and removal of the existing compromised netting before the new system was installed.
Outcome
Phase 2 delivered a comprehensive, custom-fitted netting solution that extended and improved enclosure coverage across the full driving range perimeter at Ocean Reef Club.