Lead time to begin an installation can vary. However, the average lead time is 2-4 weeks. If your netting system is smaller in size and doesn’t require the number of materials as the average netting system, the lead time could be 1-2 weeks. If your netting system is larger (i.e., 100’+ steel poles), your lead time could be 6-8 weeks or more.

We always do our best to streamline logistics, current installation projects, and the crew travel to accommodate our customers’ needs. But, be that it may, there are times when our installation calendar is quite full, and projects may need to be scheduled out a little further to begin.