AfterThe challenge
What the site needed
A fenced telecom compound, with a steel lattice tower and a raised equipment shelter, needed five new drilled concrete foundations set into its gravel yard, each location flagged out ahead of time.
What we built
The system we designed and installed
The crew augered each hole with a digger derrick inside the fence line, lined it with corrugated casing, and lowered a rebar cage into place with the derrick.
The foundations were poured in tube forms and finished near grade, then the forms came off and the gravel was regraded around them. Drilling, the pour, and the finish took four working days in July 2023.
AfterThe outcome
What it means for the site
The compound now has five finished concrete foundations in place beside its equipment shelter.
Get a quote for pole setting
Tell us where the project is and the rough height and length. Our team will follow up within one business day.
Prefer to talk?
Call the team that built this one
Ask about drilled foundations, pole types, or what a job like this costs today.
1-800-274-1079- Design, engineering, and installation under one contract
- Steel, wood, or concrete poles set by our own crews
- Breakaway netting engineered for wind and snow load
Hillsborough County, FL